Faller 120149 Cinder removing facility
Above the slag pit the ground plate is provided with two driving rails. It can be connected to all types of tracks, even those with middle conductor, excepted Marklin’s C track. Combining two inspection pits (120136) allows to build a two-track deslagging plant with a parallel track distance of 67 mm, matching that of the bunker (120148). Such an installation allows the gantry crane to span 3 tracks - 2 slag pits and 1 track for slag wagons. This building kit contains: 69 single parts in 2 colours and 1 construction instruction. Use for handicrafts FALLER - plastic glue.
Level of difficulty: Beginners
Period II: 1921 - 1945
Dimensions: 344 x 147 x 102 mm