Faller 120284 Double Sanding Tower HO Gauge
Alongside the engine shed tracks. Two steel towers linked with each other through a platform and featuring cross girders and ladders to ensure the filling of engines with brake sand. Dry gritting sand reaches both silos through a rising pipe and is poured via swiveling delivery booms.
Level of Difficulty:
Beginners
Category:
Railway Technical Building
Period II:
1921 - 1945
Dimensions:
105 x 38 x 135 mm